COMPLETE HEATING SOLUTION WITH GAS SAVING TECHNOLOGY
-
TEMCombustion team are experience and specialised in Glove Manufacturing. We are capable to design complete system solution by propose suitable Blower, Chamber and Burner to ensure a good combustion system for the fully utilize the use of Natural Gas in order to achieve zero-waste solution.
TEMCombustion have successfully implemented a design with lesser quantity of machinery and lower power consumption kW compared to others. This is achieved by TEM Combustion calculation and, research & analysis.
From TEMCombustion analysis and calculation, estimated gas consumptions are 11.74 MmBtu/hr at 36000pcs/hr with a safety factor accounting to heat loss to surroundings and temperature difference of day and night.
​
However from actual results, TEMCombustion is able to achieve 10.375 MmBtu/hr at 36000 pcs/hr using our proposed solution with our Burner, Chamber and Blower. Proving our design & calculations has had proven with an accuracy of 98.2%.
​
In conclusion, TEMCombustion Team Complete Heating Solution capable to:
​
-
Provide Proposal with Accurate Data.
-
Reduce Capital Investment.
-
Achieve best gas saving consumption.
-